|
509 Harbourfront is a streetcar route in Toronto, Ontario, Canada, operated by the Toronto Transit Commission. ==History== The Harbourfront LRT, originally designated 604 Harbourfront, began service in 1990. It was the first new Toronto streetcar route in many years, and the first to employ a dedicated tunnel, approximately 600 metres long. This starts with an underground loop at Union Station, runs south along Bay Street to the underground Queens Quay station, then turns west and emerges onto Queens Quay. The line's original terminus was Queens Quay and Spadina Loop, at the foot of Spadina Avenue; beyond this point non-revenue trackage ran north on Spadina to King, as otherwise the new line would have been disconnected from the rest of the network. Numbers in the 600-series were used at that time within the TTC for rapid transit routes (i.e., subways and the Scarborough RT) rather than low numbers as is the case today, and the Harbourfront LRT was given a number in this series to indicate that it was different from other streetcar routes; it was also shown like a subway line on the TTC map. Since the route is not grade-separated, this was later felt to be misleading and it was treated like other streetcar lines, taking the number 510. In 1997, the completion of a dedicated right of way on Spadina Avenue resulted in the Harbourfront route being relaunched as the 510 Spadina. The "Harbourfront" route name disappeared until 2000, when the Queens Quay streetcar tracks were extended west to Bathurst and Fleet Streets. The Harbourfront was then reinstated with the new number 509, and extended to Exhibition Loop at Exhibition Place, sharing its route with the 510 from Union to Spadina and with the 511 Bathurst from Bathurst onwards. The Fleet Street portion of Route 509 has since been converted to a parallel private right-of-way, so that the entire route operates entirely separate from road traffic. A proposed Waterfront West project would have extended the Harbourfront line farther west to join the existing right-of-way along the Queensway, however this project was shelved by the city in 2013.〔(【引用サイトリンク】url=http://www.insidetoronto.com/news-story/1490677-residents-share-wishlist-for-toronto-budget/ )〕 In July 2012 Waterfront Toronto began a major reconstruction of Queen's Quay West, requiring the 509 streetcar to be replaced with buses for the duration of the construction.〔(【引用サイトリンク】url=http://www.ttc.ca/News/2012/July/0726_replace_harbour.jsp )〕On October 12, 2014, streetcar service resumed on 509 Harbourfront route after an absence of over two years in order to rebuild the street to a new design as well as to replace tracks. With the new street design, two auto lanes south of the streetcar tracks were eliminated from Spadina Avenue to York Street in order to extend Harbourfront parkland to the edge of the streetcar right-of-way. Thus, streetcars now effectively run on a roadside right-of-way instead of a mid-street median. A bicycle path and rows of trees are located on the immediate south side of the right-of-way.〔 〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「509 Harbourfront」の詳細全文を読む スポンサード リンク
|